a solution to plan application process by using the SCADA system and deal with another system (ERP v7.0 simulator). To record and make supply chain report, and expecting of accomplishment or failure of the system. The manufacturing process is designed by using SCADA simulator which is WINCC v6.0, the integration between the two
Read On